This section allows you to enter cut scales to reduce the cut price as the total number of cuts increases. 


The No. of Cuts are calculated as follows:

(No. of Pre Cuts per lift x No. of lifts) + (No. of Post Cuts per lift x No. of lifts)  = Total No. of Cuts


The cut scales calculate by step, meaning:

  • Exact no. of cuts use the listed percentage.
  • If the no. of cuts is below the minimum scale, the minimum scale is used.
  • If the no. of cuts exceeds the maximum scale, the maximum scale is used.
  • If the quantity falls between two scales, the next highest scale is used.


Notes: 

  • The first scale used should begin at 100%, that way anything below that minimum scale will calculate at 100% of the price.
  • Cut cost/price per lift and lift sizes are set on each stock individually. For more information, see Stock - Adding a Stock
  • Cut prices can be overridden at a quote/order item level but the number of lifts are calculated by the system.


Creating a New Cut Scale

Step    Action

  1.      Select {Settings} and then select {Cutting} under Dockets.

  2.      Select {Cut Scales} on the right-hand side of screen to auto scroll to Cut

           Scales section.

  3.      Select {New} under Cut Scales. A New Cut Scales modal will open.



  4. Complete the fields.

Number of Cuts

Percentage
Enter in the end quantity for the cuts.

e.g. 1st Scale: 500
(from 1 -500)
2nd Scale: 1000
     (from 501 - 1000)


Enter in the percentage of the cut price you want to charge.

e.g. 1st Scale: 100 (charge 100% of the cut
price for this range)
2nd Scale: 90 (charge 90% of the cut
       price for this range)




  5.      Select {Save}. A results window will pop up to indicate the entry has been

           successfully saved.