This section allows you to enter cut scales to reduce the cut price as the total number of cuts increases.
The No. of Cuts are calculated as follows:
(No. of Pre Cuts per lift x No. of lifts) + (No. of Post Cuts per lift x No. of lifts) = Total No. of Cuts
The cut scales calculate by step, meaning:
- Exact no. of cuts use the listed percentage.
- If the no. of cuts is below the minimum scale, the minimum scale is used.
- If the no. of cuts exceeds the maximum scale, the maximum scale is used.
- If the quantity falls between two scales, the next highest scale is used.
Notes:
- The first scale used should begin at 100%, that way anything below that minimum scale will calculate at 100% of the price.
- Cut cost/price per lift and lift sizes are set on each stock individually. For more information, see Stock - Adding a Stock.
- Cut prices can be overridden at a quote/order item level but the number of lifts are calculated by the system.
Creating a New Cut Scale
Step Action
1. Select {Settings} and then select {Cutting} under Dockets.
2. Select {Cut Scales} on the right-hand side of screen to auto scroll to Cut
Scales section.
3. Select {New} under Cut Scales. A New Cut Scales modal will open.
4. Complete the fields.
Number of Cuts | Percentage |
Enter in the end quantity for the cuts. e.g. 1st Scale: 500 (from 1 -500) 2nd Scale: 1000 (from 501 - 1000) | Enter in the percentage of the cut price you want to charge. e.g. 1st Scale: 100 (charge 100% of the cut price for this range) 2nd Scale: 90 (charge 90% of the cut price for this range) |
5. Select {Save}. A results window will pop up to indicate the entry has been
successfully saved.