To save time creating standard multi-part jobs, these Group Templates can be inserted into an order or quote for any customer.
Ungrouped Products can be added from scratch, added new from an existing template, or inserted.
To add a new Ungrouped Product from Scratch:
Step Action
1. Select {Settings} and then select {Group Templates} under Dockets.
2. Select {New} under Ungrouped Products. A New Group Template Item page will
open on the Details tab.
3. Complete the Details fields.
Field | Description |
Number | The Number will be systemically generated. |
Name | Enter a Name for the order item. |
Description | Enter a Description for the order item. |
Insert Job Template | Select to Insert Job Template. An Add Job Template modal will open. Check the box on the left-hand side of template to be added and select {Add}. |
Units of Measure | Select an option from the drop-down that connects quantity and sets. (i.e. 500 Pads of 50) Note: These options can be modified. (See Dockets-Units of Measure) |
Sets | Enter a value for the number of repeat artwork on a job. (i.e. 50 sheets for a pad, 31 sets of 3 part NCR) |
Versions | Enter a value for the number of items with the same specifications but different art. (i.e. 2 names for a business card, 2 brochures - 1 English and 1 French) |
Sheets | Enter a value for the number of physical Sheets it takes to make one finished piece. (i.e. 20 page booklet is 5 sheets, 3 sheets corner stapled is 3 sheets) |
Pages | Enter value for the number of Pages in an item (i.e. 20 page booklet is 20 pages) Note: This value is just informational. |
Item Type | Select an Item Type from the drop-down menu. Note: These options can be modified. (See Dockets-Item Types) |
Statuses | Select some Statuses from the drop-down menu. Note: These options can be modified. (See Dockets-Statuses) |
Graphics, Press, Finishing, Shipping, and Item Due Date | Select Graphics, Press, Finishing, Shipping, and Item Due Date using the pop-up calendar. Note: Selecting an Order Due Option will automatically adjust these dates. |
Time Sensitive | Select Yes or No depending on if item is Time Sensitive. Note: If Yes selected, a time picker is activated on all due dates. |
Order Due Options | Select an Order Due Option. The Graphics, Press, Finishing, Shipping, and Item Due Date will automatically adjust based on your selection. Note: These options can be modified. (See Dockets-Order Due Options) |
Graphic Artist | Select a Graphic Artist to assign from the drop-down menu. |
Assign To | Select an Assign To individual from the drop-down menu. |
Tags | Select some Tags from the drop-down menu. Note: These options can be modified. (See Dockets-Tags) |
4. Select {Save} or {Save and View}. The Save and View option will save graphics details and
open the Order Item view page.
Note: The newly created group template item will now appear under Ungrouped Products
on the Group Templates page.
To add new Ungrouped Product from Template:
Step Action
1. Select arrow icon on the right-hand side of {New} under Ungrouped Products. Select
{New From Template}. An {Add Job Template} modal will open.
2. Select templates to be added by checking box to left-hand side of the item's
Group. To add all items, check box on the left-hand side above Group column.
3. Select {Add}. A results window will pop-up to confirm the items that have been created
from template and they will now appear under Ungrouped Products.
To insert new Ungrouped Products:
Step Action
1. Select {Insert} under Ungrouped Products. An {Add Products} modal will open.
2. Select products to be added by checking box to left-hand side of the Item#. To add all items,
check box on the left-hand side above Item# column.
3. Select {Add}. A results window will pop-up to confirm the Order Item added and items will
now appear under Ungrouped Products.
Once the Ungrouped Products have been added, they can then be Grouped. For more information, see Group Templates - Grouping Ungrouped Products.